Surface Preparation
The substrate must be clean, free from laitance, oil, grease and other agents which may impair adhesion. Cleaning techniques may include acid etching, grinding, light mechanical scabbling, blasting or degreasing depending on floor contamination. Existing concrete floors should be sound and free from loose material. It is recommended that damaged areas be repaired with Eli-Patch Epoxy Repair Mortar prior to the application of Epoxy Prime 100.
Mixing
It is imperative that mixing is carried out in the resin container. Epoxy Prime 100 is a two-pack system and it is very important to ensure the hardener and resin are thoroughly mixed together. The entire contents of the hardener should be added to the entire contents of the resin pack and stirred thoroughly. Packs should not be split unless accurately weighed. Once mixed Epoxy Prime 100 must be applied immediately. Epoxy Prime 100 should be allowed to become tack free prior to the application of FixMaster epoxy systems and touch dry prior to the application of urethanes to eliminate crosslink reaction. In all cases further applications must be carried out within 72 Hours.
Application
Epoxy Prime 100 is applied to the prepared substrate by roller or brush ensuring a continuous film. Avoid over-application and puddles, porous floors may require two coats.
Reviews
There are no reviews yet.